Skip to content

Steel and iron traders: selling TMT, pipes and sheets by weight

A steel trader quotes in kilos, loads in pieces and gets paid in rupees. Every gap between the three is a margin leak.

By the Munshiji team · Updated · 5 min read

Short answer

Most steel is priced per kg or tonne but counted in pieces, so set a weight per piece for every size and agree whether the bill uses actual weighbridge weight or standard section weight. For TMT bars, weight per metre is about diameter² ÷ 162. Fix the day’s rate on the bill, attach the weighbridge slip, and raise an e-way bill above the limit.

Pieces to kilos: the TMT formula

For round bars, a standard approximation is used in the trade: weight per metre in kg = diameter in mm squared ÷ 162. Multiply by the length of the bar, usually 12 metres, to get the weight per rod.

Diameterkg per metre (D² ÷ 162)kg per 12 m rod
8 mm0.3954.74
10 mm0.6177.41
12 mm0.88910.67
16 mm1.58018.96
20 mm2.46929.63
25 mm3.85846.30

Pipes, angles, channels and sheets have their own weight tables from the mill or from the relevant Indian Standard. Keep a weight per piece for each size and thickness you stock.

Actual weight or section weight?

Actual weight on a weighbridge is often a little different from the theoretical section weight, because rolling tolerances allow some variation. Buyers and sellers must agree which one the bill uses.

  • Actual weight: load, weigh the truck loaded and empty, and bill the difference. Attach the weighbridge slip to the bill.
  • Section weight: count pieces and multiply by the standard weight. Common for small retail sales across the counter.
  • Do not mix the two in one bill. If you buy on actual weight and sell on section weight, track the difference monthly; it is part of your margin or your loss.

Count pieces even when you bill by weight. A customer who receives 98 rods instead of 100 will not be convinced by a weighbridge slip.

Daily rates and bookings

Steel rates move often, sometimes daily. Customers book at today’s rate and lift over weeks. Without written bookings, every lift becomes a rate argument.

  1. Write the booking: party, size, quantity in tonnes, rate, validity and advance received.
  2. Bill each lift against the booking, showing the booked rate and the balance quantity.
  3. Close or re-rate bookings that pass their validity, in writing.
  4. Keep a rate register with the date and time of each change, so you can show which rate applied when.

Your stock value changes with the rate too. Value closing stock the way your CA advises, usually at cost or market price, whichever is lower, and look at margin per tonne rather than per bill.

Cutting, bending and leftover lengths

Retail customers rarely want a full 12 m rod. They want 4 m pieces, bent stirrups or a sheet cut to size. Each of these creates a charge and, often, a leftover piece.

  • Bill cutting and bending as separate lines, per cut, per piece or per kg, so the customer sees the charge and the steel rate stays clean.
  • Bill the weight of the full rod if the customer takes the whole rod in pieces; bill only what he takes if you keep the leftover.
  • Keep leftover lengths (cut pieces) as a separate item, sold by weight, and count them monthly.
  • Sell true scrap separately by weight, and record the money. Scrap that goes out without a bill is a common leak in steel yards.

GST, e-way bills and transport

Iron and steel products such as TMT bars, pipes, angles and sheets are generally at 18% GST. Check the HSN for items you also stock, such as fasteners, wire mesh or roofing products.

Steel loads are almost always above the e-way bill limit, which is ₹50,000 per consignment for most movements, with some states setting their own limit inside the state. Generate the e-way bill before the truck leaves, with the vehicle number, and keep a copy with the driver.

Cutting and bending charges, loading and transport, if you charge them on the bill, generally take the GST rate of the main supply when they are part of it. Ask your CA if you run transport as a separate business.

A clean tax invoice with HSN, weight, rate and the buyer’s GSTIN lets your customer claim input tax credit. See what a full bill carries on our GST invoicing page.

Credit to builders and fabricators

Builders, contractors and fabricators often buy on credit, in large amounts, with payment tied to their own project stages. Set limits by party and by project, and keep the delivery address on every bill.

If you are registered as a micro or small enterprise and sell to a business buyer, the MSMED Act limits agreed credit to 45 days and gives you interest on late payment. Our MSME 45-day rule guide explains how it works.

For reminders that keep the relationship, see the udhaar guide. Plywood and timber yards face a similar measuring problem; see our CFT guide.

Common questions

How do I calculate the weight of a TMT bar?

Weight per metre in kg is about diameter in mm squared divided by 162. A 12 mm bar is about 0.889 kg per metre, or 10.67 kg for a 12 m rod.

Should I bill steel on actual or section weight?

Either, if agreed in advance. Use one method per bill, attach the weighbridge slip for actual weight, and still count the pieces.

What is the GST rate on TMT bars?

Iron and steel products such as TMT bars, pipes and sheets are generally at 18%. Check the HSN for other items.

When do I need an e-way bill for steel?

Usually when the consignment value is more than ₹50,000. Some states set their own limit for movement within the state.

Sources

General information, not legal or tax advice. Rules change: check the source or your CA before you act.

Bills, udhaar, stock and Tally in one place

Munshiji keeps your numbers together and tells you what needs doing today. Founder seats are open by invitation.

See the founder offer

To reserve, call or WhatsApp 70022 08642