Kitchen and sanitaryware showroom: quotes, site deliveries, returns
A showroom sale is not one bill. It is a quote, an order, three deliveries, a breakage and a return, often months apart.

Short answer
Quote per room with model numbers, colour, quantity and validity, and take an advance against a written order. Deliver against that order in parts, each with a challan or invoice the site signs, and keep a running balance of what is still to go. Check goods at unloading, record breakage on the spot, and accept returns only of unopened items within an agreed time.
Quotes that turn into orders
Customers building a house visit four showrooms and compare quotes line by line. A clear quote wins more often than a cheap one, because the customer can see exactly what he is paying for.
- Group the quote by room: master bath, common bath, kitchen, utility. Families decide room by room.
- Write brand, model number, colour and size for every line. "WC, white" invites a dispute; the model number does not.
- Show list price, discount and net price per line, with GST shown separately.
- Put a validity date on every quote. Brand price lists change, and a quote from six months ago should not bind you.
- Mention what is not included: installation, plumbing, cutting, transport to upper floors.
Number every quote and keep every revision. When a family comes back after two months, you should be able to open the exact version they saw and the rates you gave them.
From quote to order and advance
When the customer agrees, convert the quote into a written order: final items, rates, delivery address, expected dates and payment terms. Take an advance against the order and give a receipt.
Items that you order specially from the company, such as a particular colour of tiles or a full modular kitchen, should carry a larger advance, because you cannot easily sell them to anyone else if the customer backs out. Say this in the order.
Advance received against a future supply of goods is generally not taxed under GST until the invoice, but advances for services are treated differently. If you do installation or fabrication as a service, ask your CA how to handle advances.
Delivering to site in parts
Construction moves in stages. Tiles go first, CP fittings and sanitaryware later, accessories at the end. Each part delivery needs its own paper trail.
- Raise a tax invoice or a delivery challan for each delivery against the order number. Follow your CA’s advice on whether to invoice the whole order at once or each delivery.
- Generate an e-way bill when required. Movement of goods worth more than ₹50,000 in one consignment usually needs one; some states set their own limit for movement within the state.
- Get the site signature with name and phone of whoever received the goods: contractor, supervisor or owner.
- Update the order balance: what is delivered, what is pending, what is out of stock with the company.
A running balance answers the question every customer asks after three months: "What have I received and what is still left?" Without it, the showroom ends up delivering the same item twice or forgetting one.
Breakage, shortage and returns
Ceramic and glass break. Tiles come in shades and batches that do not always match a later lot. Set the rules in advance and print them on the quote.
| Situation | What to do |
|---|---|
| Broken at unloading | Note on the challan before the site signs; replace and claim from the transporter or company |
| Broken after receipt | Customer’s risk, unless your terms say otherwise |
| Extra tiles left over | Accept back only full, unopened boxes from the same batch, within an agreed number of days |
| Wrong model supplied | Replace, and take back the wrong one against a return note |
For returns of goods already invoiced, issue a GST credit note that refers to the original invoice. A credit note for a financial year has a time limit for being declared, generally by 30 November of the following year, so do not let returns pile up. Ask your CA if you are unsure.
Tile buyers should take a little extra from the same batch in the first lot, because a later batch may not match in shade. Saying this at the quote stage avoids an argument later.
GST rates and the contractor’s commission
Most sanitaryware, ceramic tiles, CP fittings, sinks and modular kitchen items are at 18% GST. After the September 2025 changes, some household kitchenware and tableware moved to 5%, so check the HSN if you also sell utensils or kitchen accessories.
Many showrooms pay plumbers, contractors and architects a commission on what they bring. Pay it against paid invoices, record it as an expense with the person’s details, and ask your CA about TDS once payments to one person cross the limit in the income-tax rules. A hidden discount instead of a recorded commission confuses both GST and books.
Customer credit is common on large orders. Agree the balance due at each stage in the order, and follow up the way our udhaar guide describes.
Common questions
What should a sanitaryware quotation include?
Brand, model number, colour, size, quantity, list price, discount, net price and GST for each line, grouped by room, with a validity date and what is not included.
Do I need an e-way bill for site deliveries?
Usually when the consignment value is more than ₹50,000, though some states set their own limit for movement within the state. Check your state’s rule.
Should I accept returned tiles?
Accept only full, unopened boxes from the same batch within an agreed time, and issue a credit note against the original invoice.
What GST rate applies to sanitaryware?
Most sanitaryware, ceramic tiles and CP fittings are at 18%. Check the HSN for kitchenware and utensils, some of which moved to 5% in September 2025.
Sources
General information, not legal or tax advice. Rules change: check the source or your CA before you act.
Bills, udhaar, stock and Tally in one place
Munshiji keeps your numbers together and tells you what needs doing today. Founder seats are open by invitation.
See the founder offerTo reserve, call or WhatsApp 70022 08642